All posts

What a two-app jobsite stack really costs

Most contractors who already buy software for this buy it twice. One subscription for job site photos, another for hours. Neither vendor is doing anything wrong — they are each solving their own problem well — but the bill adds up faster than anybody planned for, and the two systems never speak to each other.

Here is the arithmetic at eight field workers, which is where a lot of owner-operators sit.

The two-app bill

ToolWhat it doesPer month
CompanyCamJob site photos~$99
busybusyTime tracking~$120
TogetherTwo logins, two bills~$219

Those are approximate published list prices and both vendors change them, so check your own invoice rather than taking this table as gospel. At twenty workers the same pair runs closer to $620.

Two hundred and nineteen dollars is not an outrageous number for what you get. It is roughly a third of a day’s labour. If the two tools were doing the whole job, it would be money well spent.

The part the bill does not cover

They are not doing the whole job, and the gap is not a feature either of them is missing. It is the seam between them.

Your photo app knows there are forty pictures of a repaint at 412 Oak Street. Your time app knows twenty-six hours went to a job called “Oak St repaint.” Neither one knows those are the same job. So when you sit down on Sunday night and want to answer did we make money on Oak Street, you are the integration. You open two tabs and reconcile them by memory.

That is the actual cost, and it is not on either invoice:

  • You cannot see labour cost next to the evidence of the work. The photo showing three days of unexpected rot lives somewhere completely separate from the twenty-two extra hours it caused.
  • Job names drift. “412 Oak”, “Oak Street”, “Henderson repaint” — three names for one job across two systems, and no way to enforce agreement.
  • Two sets of workers to keep in sync. Somebody leaves and you have to remember to remove them twice, and you are still paying for them in one of the two.
  • Two apps on the phone. A worker who has to open one thing to clock in and another thing to take a picture will, reliably, stop doing one of them.

Why one record matters more than one invoice

The saving is real, but it is the least interesting reason to consolidate. Buying a bundle to shave a hundred dollars is a decision you can regret. Buying a single record of the work is a decision that gets more valuable every month you stay, because the history compounds.

When the photograph, the hours and the assignment all hang off the same Job, three questions stop being research projects:

  1. What did this job cost in labour, by activity? Not “twenty-six hours” — eleven hours of prep, nine of spray, six of cleanup. Which tells you whether to bid the next one differently, and where.
  2. What did it look like before we started? The estimate photos are already attached to the property, taken weeks before the job existed.
  3. Who was actually there on the Tuesday? Not who was scheduled. Who was assigned, and whose hours landed against it.

If you are not paying for anything yet

Most crews this size are not. The photos are on somebody’s phone, the hours are on a clipboard in the truck, and tomorrow’s plan is in a group chat. If that is you, the two-app comparison is beside the point — you do not have a switching cost, you have a starting cost, and it is the same either way.

The question is not whether $219 is too much. It is whether a year from now you want to be able to answer what any given job actually cost you.

This is being built right now

One app for job photos, hours and the schedule. Leave an email and you will hear from us once, when it opens.

One email when Crewsome opens, and nothing else. No newsletter, no partners.